Definitely a boring story

The other day we reported that Level 3A of Main Square car park had been closed – we guessed in preparation for building modifications.

It now looks as if we were right.  Holes have been bored into the structure in various places – particularly the pillars – presumably to check on its integrity.  This pillar shows a couple of holes that have been filled again, but where the cement is still wet.

P1130919b

It rather looks as if another hole was drilled into the pillar some time ago.  Which makes us wonder how many holes can be drilled before the structure is weakened significantly.

Also, as the borough council has now bought the building, an odd thought occurs to us.  If an ordinary person buys a house, they usually have a survey carried out BEFORE they exchange contracts.  Is the council doing things the other way round??

 

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s